Overhead Bridge Cranes: Raise Worker Safety


Many companies in the construction and manufacturing industries depend on overhead cranes for lifting and transporting materials. If they are installed and used correctly, these systems make operations simpler and safer. Overhead cranes are one of the leading causes of industrial injuries and deaths. According to the Occupational Safety and Health Administration (OSHA), crane accidents in the construction and general industries cause an average of 71 fatalities every year in the US. The following precautions need to be taken to ensure a safe working environment.

Things to Do Before Lifting the Load

Ensure that you have removed loose parts, materials, packing and blocking before you lift the weight. You also need to ensure that you have removed any slack from the hoisting and sling ropes before lifting. Again make sure that the lifting device is seated in the saddle of the hook, and that the loads don’t exceed the maximum load capacity.

How to Move Loads Safely

Ensure that you move the crane controls smoothly and avoid jerky, abrupt movement of the load. Also, ensure that you accept signals from only one person who is in charge of the lifting, except for a stop sign. Again, make sure that everyone is away from the load before you hoist it. Start by sounding a siren, bell or alarm before you start the machine and then raise the load slowly. Also, ensure that nothing catches or is linked to the weight while lifting or moving.

Before Leaving the Crane

Before leaving the crane, remove the load from the hooks and raise the hooks to mid-position. Also, ensure that the controllers are turned off before turning off the main switch.

Cranes provide greater efficiency for doing heavy work, but if they are not operated safely, they are a risk to the lives of the operator and those in the vicinity. If you need parts and accessories for overhead bridge cranes, you can get them from suppliers such as the Proserv Crane Group.